Product Detail :
|
Proposed Destressing of LWR track (33.456 km), Rail painting (20.958 km) and ERC greasing (21.587 km) at Isolated Locations between Kilometer 408.650 to 433.500 on UP and DN Line between AYR - DG stations, KM 433.494 to 439.500 between DG - ABI stations on UP line, KM 70.650 to 73.000 between DG - EDU stations and VDM, TMP and DG yard Loop lines in SSE/p.way/DG section. (2) Destressing UP Line from km-358/415 to 408/650 for a length of 50.235 kms , Down Line from Km.358/415 to 408/650 for a length of 52.085 kms (including detour 1.85 km), including Rd.No.1 & 4 of VPJ yard for a length of 1.440 kms , Rd No.4 of KFC yard for a length of 0.781kms, and Rd.No.4 of AYR yard for a length of 0.567 kms Total Length of 105.108 kms in between KLS - AYR stations in SSE / P.Way / MPA section
|
Tender Detail : |
(1) Mdu /north/ Mdu Jurisdiction: Proposed Destressing of Lwr Track (33.456 Km),rail Painting (20.958 Km) and Erc Greasing (21.587 Km) at Isolated Locations Between Kilometer 408.650 to 433.500 on Up and Dn Line Between Ayr - Dg Stations, Km 433.494 to 439.500 Between Dg - Abi Stations on Up Line, Km 70.650 to 73.000 Between Dg - Edu Stations and Vdm, Tmp and Dg Yard Loop Lines in Sse/p.way/dg Section. (2) Destressing Up Line From Km-358/415 to 408/650 for a Length of 50.235 Kms , Down Line From Km.358/415 to 408/650 for a Length of 52.085 Kms (including Detour 1.85 Km), Including Rd.no.1 & 4 of Vpj Yard for a Length of 1.440 Kms , Rd No.4 of Kfc Yard for a Length of 0.781kms, and Rd.no.4 of Ayr Yard for a Length of 0.567 Kms Total Length of 105.108 Kms in Between Kls - Ayr Stations in Sse / P.way / Mpa Section |