Product Detail :
|
Zonal piece works contract -zone al dindigul & manaparai. pway sections for the period from 01.07.2022 to 30.06.2023. zonal piece works contract zone a2 palani p.way section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract zone a3 pudukottai pway section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract zone a4 sivaganga pway section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone a5 mandapam pway section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone 8113g/madurai and mg/madurai pway sections for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone 82 andipatti pway section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone b3 madurai city (staff quarters) for the period from 01.07.2022 to 30,06.2023. zonal piece works contract - zone 84 manamadurai pway section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone b5 madurai city (service buildings) for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone 86 kodaikkanal hills for the period from 01.072022 to 30.06.2023. zonal piece works contract zone c1 virudhunagar p.way section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone c2 sivakasi p.way section for the period from 01.07,2022 to 30.06.2023. zonal piece works contract - zone c3 tuticorin p.way section for the period from 01.072022 to 30.08.2023. zonal piece works contract - zone c4 tirunelveli and srivaikundam p.way sections for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone c5 sengottai p.way section for the period from 01.07.2022 to 30.06.2023. zonal piece works contract - zone cs punalur p.way section for the period from 01.07.2022 to 30.06.2023. virudunagar - tenkasi - sengottai section - proposed standardization of formation at isolated locations between km -624.000 to 667.300 in between stations sankarankovil - sengottai in sengottoi permanent way section. vanchi maniyachchi - tirunelveli & tirunelveli - tenkasi section - proposed standardization of formation at isolated locations between km -9.300 to 11.850 in between stations naraikkinar - gangaikondan and at isolated locations between km -29.400 to 56.300 in between stations tirunelveli -ambasamudram in tirunelveli permanent way section. virudunagar tuticorin section proposed increasing of sleeper density from 4.4.7 to 4.4.8 at isolated locations on up main lines for a length of 7.846 km and increasing sleeper density from m04 to m+7 on loop lines for a length of 12.061 kms at various station yards in senior section engineer / permanent way/tuticorin section. vanchi maniyachchi - tuticorin section -proposed through rail renewal (primary) at isolated locations from km -645.561 to 646.346, km.647.132 to 652.305 for a length of 5.958 kms in between stations tattapparai - tuticorin in senior section engineer/ permanent way tuticorin section. vanchi maniyachchi tuticorin & vanchi maniyachchi tinmelveli section - complete track renewal (primary) for a length of 2.732 kms by manual from km645.320 to 645.561, 646.346 to 647.132,652.305 to 654.010 in between stations tattapparai tuticorin in senior section engineer/ permanent way/ tuticorin section and 0.170 kms by manual from km-0.370 to 0.540 in between stations vanchi maniyachchi-naraikkinar in senior section engineer permanent way/ tfrunelvell section including deep screening for a length of 1.875kms. assistant divisional engineer /south sub division proposed increasing sleeper density from mo4 to mr-7, on loop lines for a length of 8.466 kms at various station yards in senior section engineer/ permanent way/ virmlunamar & sivakasi section. madurai-tuticorin & vanchimaniyachchi-tirunelveli section -through rail renewal in points and crossings (cs.civisc) of 15 sets in 1 in 12 with new 60kg rails including fittings and fastenings at tirumangalam, virudunagar, tulukapatti, vanchi maniyachchi, tattapparai & gangalkondan stations in senior section engineer/ permanent way virudunagar, tuticorin & tironelveli section. dindigui-madurai (on line) section - complete track renewal (primary) for a length of 10.100 kms by using pqrs/sqrs train / manual between km -433.500 to 443.600 in between stations indigo and ambaturai in senior section engineer/ permanent way/ indigo, section. tiruchirappath-dindigul - elimination of causeway by new bridge no.1142/a km 343/800-3441100 and 1143a itkm 344/800-3451200. madurai-manamadurai section provision of foot over bridge at tiruppachetti station. milavittan - improvements to freight train examination facilities. assistant divisional engineer/ south & sengottai sub division hiring of 3 number of open body
|