Product Detail :
|
Construction of unidirectional tunnel i.e. length of 2.64/2.63km (tube- 1/tube-2) and its approach road from km 6+405 to km 12+850 of total length 6.445km including 01no. viaduct, 03 nos. of viaducts cum bridge on sudhmahadev- daranga section of nh-244 in the union territory of jammu & kashmir on epc mode (pkg-ii).
|